Violation Detail
Standard Cited: 19100430 B01 Equipment.
Inspection Nr: 1015056.015
Citation: 01009A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 06/03/2015
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 06/22/2015
Gravity:
Report ID: 0418800
Contest Date: 06/25/2015
Final Order: 01/29/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 01/29/2016 | $7,000.00 | 06/22/2015 | Other | |
Penalty | C: Contested | 07/01/2015 | $7,000.00 | 06/22/2015 | Serious | |
Penalty | Z: Issued | 06/03/2015 | $7,000.00 | 06/22/2015 | Serious |
Text For Citation: 01 Item/Group: 009A Hazard:
29 CFR 1910.430(b)(1): Compressors used to supply air to a diver were not equipped with all of the following: a volume tank with a check valve on the inlet side, a pressure gauge, a relief valve, and a drain valve, is applicable to the Construction Standard 29 CFR 1926.1090 which incorporates the General Industry Requirements: a) On or about January 27, 2015, at the jobsite, 1 East 11th Street - Slip 3, Riviera Beach, Florida 33404, the employer did not ensure the Dive Boss air compressor used by divers had a operable tank pressure gauge. The indicating needle of the gauge was stuck at approximately 225 pounds per square inch. b) On or about January 20, 2015, at the jobsite, 1 East 11th Street - Slip 3, Riviera Beach, Florida 33404, the employer did not ensure the Brownie air compressor, which does not have a volume tank, was being used to supply air to the divers.