Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 984276.015
Citation: 01009
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,520.00
Current Penalty: $1,512.00
Issuance Date: 12/23/2014
Nr Instances: 1
Nr Exposed: 15
Abatement Date: 01/23/2015
Gravity: 5
Report ID: 0636900
Contest Date:
Final Order: 01/28/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/28/2015 | $1,512.00 | 01/23/2015 | Serious | |
| Penalty | Z: Issued | 12/23/2014 | $2,520.00 | 01/23/2015 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and cables were run through holes in walls, ceilings, or floors: On or about July 9, 2014, and at times prior thereto, in building 1, the employer used an extension cord on the west wall that was run thru a hole to supply electrical power and lighting inside a storage container exposing the employees to fire hazards.
Translate