Violation Detail
Standard Cited: 19100303 G01 I General.
Inspection Nr: 923010.015
Citation: 01009
Citation Type: Serious
Abatement Date: 12/31/2013
Initial Penalty: $7,000.00
Current Penalty: $1,500.00
Issuance Date: 09/27/2013
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0134000
Contest Date:
Final Order: 11/22/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/22/2013 | $1,500.00 | 12/31/2013 | Serious | |
Penalty | Z: Issued | 09/27/2013 | $7,000.00 | 11/15/2013 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard:
29 CFR 1910.303(g)(1)(i): The dimension of the working space in the direction of access to live parts operating at 600 volts or less and likely to require examination, adjustment, servicing, or maintenance while alive was less than indicated in Table S1:(a) (LOCATION) (IDENTIFY EQUIPMENT AND CONDITION(S)) (STATE HAZARD(S) TO EMPLOYEE(S) AND SPECIFY DISTANCE REQUIRED) (a) Steam Power Building, upper level: On or about 7/24/2013, there were structural impediments that would limit an electrician to approximately 12 inches of access at the electrical boxes. (b) Near the Bagger area: On or about 7/24/2013, there were structural impediments that would limit an electrician to approximately 12 inches of access at the electrical boxes.