Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 314198375
Citation: 01009
Citation Type: Other
Abatement Status: X
Initial Penalty: $2,000.00
Current Penalty: $1,000.00
Issuance Date: 08/09/2010
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 08/19/2010
Gravity: 02
Report ID: 0418300
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Substance: 0170
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/01/2010 | $1,000.00 | 08/19/2010 | Other | |
| Penalty | Z: Issued | 08/09/2010 | $2,000.00 | 08/19/2010 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard: CHEMNEP
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment: a) On or about February 24, 2010 - mechanical integrity procedures developed by the employer did not include the inspection frequencies for pumps, compressors, pipes, and vessels of the refrigeration system. b) On or about February 24, 2010 - Ammonia refrigeration machine room, the employer's written mechanical integrity program (MI) did not include inspection and testing for ammonia pipes.a
Translate