Violation Detail
Standard Cited: 19100305 G01 IV Wiring methods, components, and equipment for general use.
Inspection Nr: 190339.015
Citation: 01009
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $5,500.00
Current Penalty: $3,000.00
Issuance Date: 07/12/2012
Nr Instances: 1
Nr Exposed: 67
Abatement Date: 06/14/2013
Gravity:
Report ID: 0728900
Contest Date: 07/27/2012
Final Order: 08/09/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 08/09/2013 | $3,000.00 | 06/14/2013 | Other | |
| Penalty | C: Contested | 07/30/2012 | $5,500.00 | 07/27/2012 | Serious | |
| Penalty | Z: Issued | 07/12/2012 | $5,500.00 | 07/27/2012 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard:
29 CFR 1910.305(g)(1)(iv): Unless specifically permitted otherwise in paragraph (g)(1)(ii) of this section, flexible cords and cables may not be used: Northeast corner of Main production area in the facility The employer is failing to ensure employees are protected from electrical hazards. These include, but are not limited to the following. Extension cords are being attached to the metal building surface and run through the same metal surface of the building; both of which are prohibited under this standard. The flexible cord is being used to power a battery charging station which is energized to 240 volts. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citations.
Translate