Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 190088.015
Citation: 01009
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,200.00
Current Penalty: $1,696.00
Issuance Date: 05/15/2012
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 06/06/2012
Gravity: 10
Report ID: 0215800
Contest Date: 06/11/2012
Final Order: 12/17/2012
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 12/17/2012 | $1,696.00 | 06/06/2012 | Serious | |
| Penalty | C: Contested | 06/15/2012 | $4,200.00 | 06/06/2012 | Serious | |
| Penalty | Z: Issued | 05/15/2012 | $4,200.00 | 06/06/2012 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard:
29 CFR 1926.850(a): An engineering survey was not performed by a competent person to determine the conditions of the framing, floors, and walls and the possibility of unplanned collapse of any portion of the structure prior to permitting employees to start demolition operations: a) On or about 1/25/2012, At the job site 9th and 10th floors: An engineering survey had not been performed prior to the start of demolition work. There was an unplanned collapse on the ninth floor. Abatement documentation is required for this item.