Violation Detail
Standard Cited: 19100305 B01 II Wiring methods, components, and equipment for general use.
Inspection Nr: 1736239.015
Citation: 01009
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $8,067.00
Current Penalty: $0.00
Issuance Date: 07/26/2024
Nr Instances: 2
Nr Exposed: 10
Abatement Date: 08/19/2024
Gravity: 5
Report ID: 0521400
Contest Date:
Final Order: 08/16/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/16/2024 | $0.00 | 08/19/2024 | Other | |
| Penalty | Z: Issued | 07/26/2024 | $8,067.00 | 08/19/2024 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard:
29 CFR 1910.305(b)(1)(ii):Unused openings in boxes, cabinets, or fittings were not effectively closed: (a) On or about March 21, 2024 the employer did not ensure that the unused opening in the 240 volt AC panelboard cabinet located in the Custom Building room was effectively closed to prevent damage to energized circuits from contaminants such as sawdust, and to prevent unqualified employees from coming into contact with live energized parts. (b) On or about March 21, 2024 the employer did not ensure that electrical boxes with missing knockouts in front of the Molder Machine in the Molder Building were effectively closed to prevent damage to energized equipment from contaminants such as sawdust, and to prevent unqualified employees from coming into contact with live energized parts. Abatement certification is required of this item in accordance with the requirements of 29 CFR 1903.19(d).