Violation Detail
Standard Cited: 19100303 G01 I A General.
Inspection Nr: 1721955.015
Citation: 01009
Citation Type: Serious
Abatement Date: 08/12/2024 2
Initial Penalty: $10,140.00
Current Penalty: $10,140.00
Issuance Date: 07/18/2024
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 5
Report ID: 0419400
Contest Date: 08/06/2024
Final Order: 11/27/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 11/27/2024 | $10,140.00 | 08/12/2024 | Serious | |
Penalty | C: Contested | 10/10/2024 | $10,140.00 | 08/12/2024 | Serious | |
Penalty | Z: Issued | 07/18/2024 | $10,140.00 | 08/12/2024 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard:
29 CFR 1910.303(g)(1)(i)(A): For electric equipment operating at 600 volts, nominal, or less to ground, and likely to require examination, adjustment, servicing, or maintenance while energized, the depth of the working space in the direction of access to live parts (as measured from the energized parts where they were exposed or from the enclosure front or opening where they were enclosed) was less than indicated in Table S-1 of Subpart S of Part 1910: (a) Pipe mill maintenance room - On or about January 25, 2024, the electrical panel box located on the wall next to the maintenance room was blocked by material and equipment exposing employees to electrical hazards.