Violation Detail
Standard Cited: 19100303 F02 General.
Inspection Nr: 1341898.015
Citation: 01009
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,251.00
Current Penalty: $3,125.00
Issuance Date: 02/15/2019
Nr Instances: 38
Nr Exposed: 6
Abatement Date: 03/12/2019
Gravity: 1
Report ID: 0419400
Contest Date: 03/14/2019
Final Order: 06/24/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/24/2019 | $3,125.00 | 03/12/2019 | Serious | |
Penalty | C: Contested | 06/12/2019 | $6,251.00 | 03/12/2019 | Serious | |
Penalty | Z: Issued | 02/15/2019 | $6,251.00 | 03/12/2019 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard:
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: (a) Converting - On or about November 28, 2018 not all circuit breakers were labeled in two panels on the south wall. (b) New Storage Room - On or about November 28, 2018 not all breakers were labeled in two panels. In panel to the right, breakers that were labeled were not legible due to corrosion allowing employees to be exposed to electrical shock and burn hazards.