Violation Detail
Standard Cited: 19100219 F03 Mechanical power-transmission apparatus.
Inspection Nr: 1275915.015
Citation: 01009
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,805.00
Current Penalty: $6,402.50
Issuance Date: 04/16/2018
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 05/04/2018
Gravity: 10
Report ID: 0522300
Contest Date:
Final Order: 05/10/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/10/2018 | $6,402.50 | 05/04/2018 | Serious | |
Penalty | Z: Issued | 04/16/2018 | $12,805.00 | 05/04/2018 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard:
29 CFR 1910.219(f)(3): Sprocket wheels and chains which were seven (7) feet or less above the floor or platform were not enclosed: On or about November 13, 2017 the employer failed to ensure that effective guarding was in place on the chain and sprocket drive system of the Unimate robot conveyor. The chain and sprocket being powered by the three phase Baldor motor was not covered to protect employees.