Violation Detail
Standard Cited: 19100303 C03 I General.
Inspection Nr: 1245028.015
Citation: 01009
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,897.00
Current Penalty: $1,593.00
Issuance Date: 12/11/2017
Nr Instances: 2
Nr Exposed: 9
Abatement Date:
Gravity: 5
Report ID: 0524200
Contest Date:
Final Order: 01/05/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/05/2018 | $1,593.00 | Serious | ||
Penalty | Z: Issued | 12/11/2017 | $2,897.00 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard:
29 CFR 1910.303(c)(3)(i): All splices and joints and the free ends of conductors were not covered with an insulation equivalent to that of the conductors or with an insulating device identified for the purpose: a) Production Area- On August 18, 2017, the employer failed to ensure that all splices and joints, on Line 3 winder motor box and on Line 6 blower unit, were covered with an insulation equivalent to that of the conductors. No abatement certification or documentation is required for this item.