Violation Detail
Standard Cited: 19100305 G02 III Wiring methods, components, and equipment for general use.
Inspection Nr: 1214986.015
Citation: 01009
Citation Type: Other
Abatement Date: 09/05/2017 2
Initial Penalty: $5,079.00
Current Penalty: $0.00
Issuance Date: 08/09/2017
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0418100
Contest Date:
Final Order: 08/25/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/25/2017 | $0.00 | 09/05/2017 | Other | |
Penalty | Z: Issued | 08/09/2017 | $5,079.00 | 09/05/2017 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard:
29 CFR 1910.305(g)(2)(iii): Flexible cords and cables were not connected to devices and fittings so that strain relief was provided that would prevent pull from being directly transmitted to joints or terminal screws: On or about March 2, 2017, employees were exposed to electrical hazards. Employees walk and work at the presses where these damaged electrical cords were found. Employees plug the cords into outlets. a. Fan cord: Inner insulation was visible where the outer insulation had pulled loose from the connector. b. Job made extension cord: Outer insulation had pulled loose from the connector In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).