Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1137636.015
Citation: 01009
Citation Type: Other
Abatement Status: Quick Fix
Initial Penalty: $4,998.00
Current Penalty: $0.00
Issuance Date: 09/30/2016
Nr Instances: 2
Nr Exposed: 3
Abatement Date:
Gravity:
Report ID: 0316700
Contest Date:
Final Order: 10/19/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/19/2016 | $0.00 | Other | ||
Penalty | Z: Issued | 09/30/2016 | $4,998.00 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: (a) 304 South Water Street, New Oxford Pennsylvania - Lights received power through extension cords. The employer did not ensure that extension cords were not used as a substitute for fixed wiring, on or about April 5, 2016. (b) 304 South Water Street, New Oxford Pennsylvania - A heat tracer tape received power through an extension cord. The employer did not ensure that extension cords were not used as a substitute for fixed wiring, on or about April 5, 2016. No abatement certification or documentation required, corrected during the inspection.