Violation Detail
Standard Cited: 19100119 H02 III Process safety management of highly hazardous chemicals.
Inspection Nr: 1082421.015
Citation: 01009
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,900.00
Current Penalty: $3,000.00
Issuance Date: 02/04/2016
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 06/30/2016
Gravity: 10
Report ID: 0214200
Contest Date:
Final Order: 02/25/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/25/2016 | $3,000.00 | 06/30/2016 | Serious | |
Penalty | Z: Issued | 02/04/2016 | $4,900.00 | 02/26/2016 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard:
29 CFR 1910.119(h)(2)(iii): The employer did not explain to contract employees the applicable provisions of the emergency action plan as required by 29 CFR 1910.119(n): a) Establishment - PEEB Process An outside contractor conducted calibration and service on scales that are part of the covered PEEB process, without receiving information from emergency action plan; specifically evacuation procedures, emergency notification procedures. b) Establishment - PEEB Process An outside contractor conducted service & testing on the deluge system on T-153, the 15,000gallon storage tank filled with ethyl chloride, without receiving information from emergency action plan; specifically evacuation procedures, emergency notification procedures. c) Establishment - PEEB Process An outside contractor conducted service on the nitrogen system, which provided nitrogen blanket pressure of 40PSIG to the covered process, without receiving information from emergency action plan; specifically evacuation procedures, emergency notification procedures. Violation occurred on or about 9/22/2015.