Violation Detail
Standard Cited: 19100217 E01 I Mechanical power presses.
Inspection Nr: 1044433.015
Citation: 01009
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,900.00
Current Penalty: $2,450.00
Issuance Date: 08/13/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 09/30/2015
Gravity: 10
Report ID: 0524700
Contest Date:
Final Order: 08/28/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/28/2015 | $2,450.00 | 09/30/2015 | Serious | |
Penalty | Z: Issued | 08/13/2015 | $4,900.00 | 08/24/2015 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard:
29 CFR 1910.217(e)(1)(i): The employer did not establish and follow a program of periodic and regular inspections of his power presses to ensure that all their parts, auxiliary equipment, and safeguards were in a safe operating condition and adjusted. The employer did not maintain a certification record of inspections which includes the date of inspection, the signature of the person who performed the inspection and the serial number, or other identifier, of the power press that was inspected. a. Tiffin Metal Products Co. located in Tiffin, Ohio: On or about March 6, 2015, the employer did not ensure weekly press inspections were being performed on the Garco Machinery Company 60 ton full revolution power press located in the Building #2 welding department.