Violation Detail
Standard Cited: 19100147 C07 I B The control of hazardous energy (lockout/tagout).
Inspection Nr: 998318.015
Citation: 01008E
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/01/2015
Nr Instances: 5
Nr Exposed: 9
Abatement Date: 05/06/2016
Gravity: 10
Report ID: 0213100
Contest Date: 04/23/2015
Final Order: 01/06/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 01/06/2016 | $0.00 | 05/06/2016 | Serious | |
Penalty | C: Contested | 05/07/2015 | $0.00 | 05/18/2015 | Serious | |
Penalty | Z: Issued | 04/01/2015 | $0.00 | 05/18/2015 | Serious |
Text For Citation: 01 Item/Group: 008E Hazard:
29 CFR 1910.147(c)(7)(i)(B): Affected employee(s) was not instructed in the purpose and use of the energy control procedure: a) Tumbler Room - On or prior to October 3, 2014, employees performed service and maintenance activities on both the A Bank and B Bank tumblers. The company does not provide training to affected employees on lockout/tagout. b) Tumbler Room - On or prior to October 3, 2014, employees performed service and maintenance activities on Lathe 1 and Lathe 2. The company does not provide training to affected employees on lockout/tagout. c) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on Drill Presses 1, 2, 3, and 4. The company does not provide training to affected employees on lockout/tagout. d) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on the centerless grinders. The company does not provide training to affected employees on lockout/tagout. e) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on the Cup Machine. The company does not provide training to affected employees on lockout/tagout.