Violation Detail
Standard Cited: 19260552 B01 I Material hoists, personnel hoists, and elevators.
Inspection Nr: 1476017.015
Citation: 01008D
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/27/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/23/2020
Gravity: 10
Report ID: 0830400
Contest Date: 11/09/2020
Final Order: 09/20/2021
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/20/2021 | $0.00 | 11/23/2020 | Serious | |
Penalty | C: Contested | 12/02/2020 | $0.00 | 11/23/2020 | Serious | |
Penalty | Z: Issued | 10/27/2020 | $0.00 | 11/23/2020 | Serious |
Text For Citation: 01 Item/Group: 008D Hazard:
29 CFR 1926.552(b)(1)(i): Operating rules were not established and posted at the operator's station of the material hoist: (a)C & C Construction, Inc. at 82 Burlington Northern Santa Fe Railway, Hazel SD 57242: On or about and at times prior to May 22, 2020, the employer did not establish or post operating rules for the material hoist being used on site. This condition exposed employees to hazards associated with the improper use and overloading of the hoist system.