Violation Detail
Standard Cited: 19100147 C05 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 998318.015
Citation: 01008C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,800.00
Current Penalty: $0.00
Issuance Date: 04/01/2015
Nr Instances: 5
Nr Exposed: 10
Abatement Date: 05/06/2016
Gravity: 10
Report ID: 0213100
Contest Date: 04/23/2015
Final Order: 01/06/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 01/06/2016 | $0.00 | 05/06/2016 | Serious | |
Penalty | C: Contested | 05/07/2015 | $2,800.00 | 05/18/2015 | Serious | |
Penalty | Z: Issued | 04/01/2015 | $2,800.00 | 05/18/2015 | Serious |
Text For Citation: 01 Item/Group: 008C Hazard:
29 CFR 1910.147(c)(5)(i): Locks, tags, chains, wedges, key blocks, adapter pins, self-locking fasteners, or other hardware were not provided by the employer for isolating, securing or blocking of machines or equipment from energy sources: a) Tumbler Room - On or prior to October 3, 2014, employees performed service and maintenance activities on both the A Bank and B Bank tumblers. The company does not provide locks or tags to employees to ensure the energy is isolated, secured, or blocked. b) Tumbler Room - On or prior to October 3, 2014, employees performed service and maintenance activities on Lathe 1 and Lathe 2. The company does not provide locks or tags to employees to ensure the energy is isolated, secured, or blocked. c) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on Drill Presses 1, 2, 3, and 4. The company does not provide locks or tags to employees to ensure the energy is isolated, secured, or blocked. d) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on the centerless grinders. The company does not provide locks or tags to employees to ensure the energy is isolated, secured, or blocked. e) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on the Cup Machine. The company does not provide locks or tags to employees to ensure the energy is isolated, secured, or blocked.