Violation Detail
Standard Cited: 19100219 E03 I Mechanical power-transmission apparatus.
Inspection Nr: 1631293.015
Citation: 01008C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/20/2023
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 05/16/2023
Gravity: 5
Report ID: 0316700
Contest Date: 05/22/2023
Final Order: 10/16/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 10/16/2023 | $0.00 | 05/16/2023 | Serious | |
| Penalty | C: Contested | 07/12/2023 | $0.00 | 05/16/2023 | Serious | |
| Penalty | Z: Issued | 04/20/2023 | $0.00 | 05/16/2023 | Serious |
Text For Citation: 01 Item/Group: 008C Hazard:
29 CFR 1910.219(e)(3)(i): Vertical or inclined belts were not enclosed by guards conforming to the requirements specified at 29 CFR 1910.219(m) and (o): (a) Cut, Bend, Form - Department 1 - The vertical belts running between the gear reducer pulley and motor pulley on the L&J Press Corp., employer machine number P5, mechanical power press, did not have guarding , where the belts ran over the lower half of the gear reducer pulley (less than 7 feet above the floor), exposing employees to in-going nip points and caught-in hazards, on or about October 28, 2022. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Translate