Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 998318.015
Citation: 01008B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,800.00
Current Penalty: $0.00
Issuance Date: 04/01/2015
Nr Instances: 3
Nr Exposed: 10
Abatement Date: 06/06/2016
Gravity: 10
Report ID: 0213100
Contest Date: 04/23/2015
Final Order: 01/06/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 01/06/2016 | $0.00 | 06/06/2016 | Serious | |
Penalty | C: Contested | 05/07/2015 | $2,800.00 | 05/18/2015 | Serious | |
Penalty | Z: Issued | 04/01/2015 | $2,800.00 | 05/18/2015 | Serious |
Text For Citation: 01 Item/Group: 008B Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) Tumbler Room - On or about October 3, 2014, specific procedures were not developed, documented and utilized for Lathe 1 and Lathe 2 which have 2 sources of energy consisting of electricity and air. b) Drill Press Room - On or about October 3, 2014, specific procedures were not developed, documented and utilized for the centerless grinders which have 2 sources of energy consisting of electricity and water. c) Drill Press Room - On or about October 3, 2014, specific procedures were not developed, documented and utilized for the Cup Machine which has 2 sources of energy consisting of electricity and air.