Violation Detail
Standard Cited: 19100119 J04 II Process safety management of highly hazardous chemicals.
Inspection Nr: 314506338
Citation: 01008B
Citation Type: Serious
Abatement Status: I
Initial Penalty:
Current Penalty:
Issuance Date: 01/05/2011
Nr Instances: 4
Nr Exposed: 10
Abatement Date: 01/10/2011
Gravity:
Report ID: 0855610
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/23/2011 | 01/10/2011 | Serious | ||
Penalty | Z: Issued | 01/05/2011 | 01/10/2011 | Serious |
Text For Citation: 01 Item/Group: 008B Hazard: REFINERY
1910.119(j)(4)(ii)* Mechanical integrity. Inspection and testing. Inspection and testing procedures shall follow recognized and generally accepted good engineering practices: 1. During exchanger inspection and testing for CE403 (Depropanizer Reboiler), employer did not follow RAGAGEP (API 510) or Mechanical Integrity Program "Inspection & Testing Procedures", regarding inspection location points. 2. Welding program/procedures were not complete to address RAGAGEP associated with Center for Chemical Process Safety (Mechanical Integrity) and AWS regarding quality assurance and qualifications of maintenance personnel associated with welding. 3. During repair work on Depropanizer Reboiler Condensate Knockout Pot RAGAGEP was not followed associated with hydrostatic testing prior to installation/use after repairs were made. 4. Prior to 2009 retirement thickness and previous repairs & replacement documentation was not properly collected/maintained (2P544-6 - BC 1978).