Violation Detail
Standard Cited: 19100147 C06 I B The control of hazardous energy (lockout/tagout).
Inspection Nr: 281167.015
Citation: 01008B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $70,000.00
Current Penalty: $0.00
Issuance Date: 08/23/2012
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 08/01/2014
Gravity: 10
Report ID: 0728900
Contest Date: 08/30/2012
Final Order: 08/08/2013
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/08/2013 | $0.00 | 08/01/2014 | Serious | |
Penalty | C: Contested | 09/06/2012 | $70,000.00 | 09/22/2012 | Willful | |
Penalty | Z: Issued | 08/23/2012 | $70,000.00 | 09/22/2012 | Willful |
Text For Citation: 01 Item/Group: 008B Hazard:
29 CFR 1910.147(c)(6)(i)(B): The periodic inspection of the energy control procedure was not conducted to correct any deviations or inadequacies identified: On the kill floor, the employer is failing to ensure deviations and/or inadequacies discovered through an energy control procedure periodic inspection are being corrected. This violation was most recently documented in relation to the split saw platform, where the written energy control procedure in effect was not in agreement with the level of safety precautions known to be needed, and being used by some employees.