Standard Cited: 19260451 E06 VI General requirements.
Inspection Nr: 1769386.015
Citation: 01008B
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/14/2025
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 03/06/2025
Gravity: 5
Report ID: 0317000
Contest Date:
Final Order: 04/09/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 02/14/2025 | $0.00 | 03/06/2025 | Serious |
Text For Citation: 01 Item/Group: 008B Hazard:
29 CFR 1926.451(e)(6)(vi): Integral prefabricated scaffold access frames being used for access had a spacing greater than 16 3/4 inches: a) Jobsite: 2250 E Cambria St, Philadelphia, PA 19134 - On or about August 17, 2024, the employer did not ensure the maximum spacing between the rungs on the integral prefabricated scaffold access frames of the supported tubular welded frame scaffold did not exceed 16 3/4 inches. The spacing between the rungs on the integral prefabricated scaffold access frames used by employees to access the scaffold was approximately 20 inches, thereby exposing employees to fall hazards.