Violation Detail
Standard Cited: 19100303 G01 I C General.
Inspection Nr: 1739050.015
Citation: 01008B
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/20/2024
Nr Instances: 1
Nr Exposed: 4
Abatement Date:
Gravity: 1
Report ID: 0112000
Contest Date:
Final Order: 07/24/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/24/2024 | $0.00 | Serious | ||
Penalty | Z: Issued | 06/20/2024 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 008B Hazard:
29 CFR 1910.303(g)(1)(i)(C): For electric equipment operating at 600 volts, nominal, or less to ground, and likely to require examination, adjustment, servicing, or maintenance while energized, the width of work space was not clear and did not extend from the grade, floor, or platform to the height required by paragraph (g)(1)(vi) of 29 CFR 1910.303. Other equipment associated with the electrical installation and located above or below the electric equipment extended more than 153 mm (6 in.) beyond the front of the electric equipment: Grinding Department: On, or about, April 5, 2024, a General Electric step-up transformer was located in the working space for a General Electric A Series panelboard.