Violation Detail
Standard Cited: 19100119 L04 Process safety management of highly hazardous chemicals.
Inspection Nr: 1532217.015
Citation: 01008B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/05/2021
Nr Instances: 1
Nr Exposed: 220
Abatement Date: 06/30/2022
Gravity: 5
Report ID: 0830500
Contest Date:
Final Order: 12/03/2021
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/03/2021 | $0.00 | 06/30/2022 | Other | |
| Penalty | Z: Issued | 11/05/2021 | $0.00 | 01/10/2022 | Serious |
Text For Citation: 01 Item/Group: 008B Hazard:
29 CFR 1910.119(l)(4): A change covered by 29 CFR 1910.119(l) resulted in a change in the process safety information required by 29 CFR 1910.119(d) and the process information was not updated: (a) Protein for Pets Opco, LLC, dba All American Pet Proteins, at 259 30th Street, Greeley, CO: On and preceding 9/3/2021, a change covered by 29 CFR 1910.119(l) resulted in a change in the process safety information required by 29 CFR 1910.119(d) and the process information was not updated. Employees operated and maintained an ammonia refrigeration system. The refrigeration system contained approximately 12,700 pounds of ammonia. A Hansen Technologies model HVK5D/7 three inch gas powered suction stop valve replaced an existing valve in the rooftop evaporator valve group, identified as valve HV-12 within evaporator group EV-2. The employer's process safety information indicated that control valves were to be Danfoss valves. The process safety information was not updated with the replacement valve's information. This condition exposed employees to an ammonia hazard.