Violation Detail
Standard Cited: 19100219 C04 II Mechanical power-transmission apparatus.
Inspection Nr: 1421498.015
Citation: 01008B
Citation Type: Other
Abatement Date: 03/12/2020 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/31/2020
Nr Instances: 3
Nr Exposed: 4
Related Event Code (REC):
Gravity:
Report ID: 0418100
Contest Date:
Final Order: 02/18/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/18/2020 | $0.00 | 03/12/2020 | Other | |
Penalty | Z: Issued | 01/31/2020 | $0.00 | 03/12/2020 | Serious |
Text For Citation: 01 Item/Group: 008B Hazard:
29 CFR 1910.219(c)(4)(ii): The unused keyway(s) of projecting shaft end(s) were not filled up or covered: a) Plant, Repack Area - On or about 08/06/19 and at times prior thereto the 1-1/8 in. diameter unguarded shaft in the Traypack 2-way white band conveyor did not have the keyway filled or covered. Employees were exposed to laceration hazards. b) Plant, Hydro-cooler #1 - On or about 08/06/19 and at times prior thereto the unguarded shaft for the dual chain and sprocket system that powered the conveyor did not have the keyway filled or covered. Employees were exposed to laceration hazards. c) Plant, Hydro-Cooler #1 - On or about 08/06/19 and at times prior thereto the unguarded shaft in the trash remover conveyor did not have the keyway filled or covered. Employees were exposed to laceration hazards. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).