Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 1228064.015
Citation: 01008B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/28/2017
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/11/2017
Gravity: 10
Report ID: 0316400
Contest Date:
Final Order: 11/10/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/10/2017 | $0.00 | 10/11/2017 | Serious | |
| Penalty | Z: Issued | 09/28/2017 | $0.00 | 10/11/2017 | Serious |
Text For Citation: 01 Item/Group: 008B Hazard:
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6): (a) 205 Young Street: On or about April 24, 2017 and times prior, employees setup a ladder jack scaffold with a 24ft. by 12in. aluminum scaffold plank 2ft. to 3ft. below a 240 volt residential power drop approximately 10ft. 5in. from grade.
Translate