Violation Detail
Standard Cited: 19100147 F03 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1226618.015
Citation: 01008B
Citation Type: Serious
Abatement Date: 11/06/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/11/2017
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 10/24/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/24/2017 | $0.00 | 11/06/2017 | Serious | |
Penalty | Z: Issued | 10/11/2017 | $0.00 | 11/06/2017 | Serious |
Text For Citation: 01 Item/Group: 008B Hazard:
29 CFR 1910.147(f)(3)(i): A procedure was not utilized to afford the employees a level of protection equivalent to that provided by the implementation of a personal lockout or tagout device when servicing and/or maintenance was performed by a more than one employee: (a) On or about July 5, 2017, and times prior thereto inside of the Tunnel Kiln, a procedure was not utilized to afford a level of protection equivalent to that provided by the implementation of a personal lockout or tagout device when maintenance was performed as a group.