Violation Detail
Standard Cited: 19261425 C03
This violation item has been deleted.
Inspection Nr: 1162135.015
Citation: 01008B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/18/2016
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 11/21/2016
Gravity: 10
Report ID: 0522500
Contest Date:
Final Order: 11/02/2016
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/02/2016 | $0.00 | 11/21/2016 | Serious | |
| Penalty | Z: Issued | 10/18/2016 | $0.00 | 11/21/2016 | Serious |
Text For Citation: 01 Item/Group: 008B Hazard:
29 CFR 1926.1425(c)(3): The materials must be rigged by a qualified rigger. a. On the site the steel erector did not provide a qualified rigger to rig sections of steel being hoisted to the top of the structure for connecting around the elevator shaft thereby exposing employees to a struck-by hazard.
Translate