Violation Detail
Standard Cited: 19100219 C03 Mechanical power-transmission apparatus.
Inspection Nr: 1077467.015
Citation: 01008B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/24/2015
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 06/01/2016
Gravity: 10
Report ID: 0729300
Contest Date:
Final Order: 01/21/2016
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/21/2016 | $0.00 | 06/01/2016 | Serious | |
Penalty | Z: Issued | 12/24/2015 | $0.00 | 02/12/2016 | Serious |
Text For Citation: 01 Item/Group: 008B Hazard:
29 CFR 1910.219(c)(3): Vertical or inclined shafting was not enclosed with stationary casing(s): a/ Inside of the Secondary Building, specifically the Two-Roll Straightener, an inclined shaft approximately four feet from the floor was unguarded.