Violation Detail
Standard Cited: 19100305 G01 III Wiring methods, components, and equipment for general use.
Inspection Nr: 904561.015
Citation: 01008A
Citation Type: Serious
Abatement Date: 06/20/2013 2
Initial Penalty: $3,000.00
Current Penalty: $3,000.00
Issuance Date: 06/10/2013
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 1
Report ID: 0111500
Contest Date:
Final Order: 06/26/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/26/2013 | $3,000.00 | 06/20/2013 | Serious | |
Penalty | Z: Issued | 06/10/2013 | $3,000.00 | 06/20/2013 | Serious |
Text For Citation: 01 Item/Group: 008A Hazard:
29 CFR 1910.305(g)(1)(iii): Flexible cords and/or cables used as permitted in paragraphs (g)(1)(i)(c), (g)(1)(i)(f), or (g)(1)(i)(h) of this section were not energized from appropved receptacle outlets: Barrel Storage Area (BSA): The flexible cord, used to energize a portable pump on the floor went over and wrapped around the overhead building structure and then wired into an electrical box.