Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 1621763.015
Citation: 01008A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $14,063.00
Current Penalty: $8,600.00
Issuance Date: 02/07/2023
Nr Instances: 1
Nr Exposed: 4
Abatement Date:
Gravity: 10
Report ID: 0523400
Contest Date:
Final Order: 03/08/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/08/2023 | $8,600.00 | Serious | ||
Penalty | Z: Issued | 02/07/2023 | $14,063.00 | Serious |
Text For Citation: 01 Item/Group: 008A Hazard:
29 CFR 1910.219(c)(4)(i): Unguarded projecting shaft end(s) did not present a smooth edge and end and projected more than one half the diameter of the shaft:(a) (a) On or about September 13, 2022, on the second floor of the sorting conveyor at the Plastic Max conveyor line, adequate machine guarding was not provided to protect employees working at or around the dodge drive to include its energized and exposed rotating shaft end that was operating without adequate guarding in place. This exposed the employee to a caught -on and caught-in hazard. This exposed employees to an amputation hazard.