Standard Cited: 19100269 A02 I A Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1288018.015
Citation: 01008A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,467.00
Current Penalty: $4,850.00
Issuance Date: 05/21/2018
Nr Instances: 1
Nr Exposed: 12
Abatement Date: 08/01/2018
Gravity: 5
Report ID: 0111700
Contest Date:
Final Order: 06/15/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/15/2018 | $4,850.00 | 08/01/2018 | Serious | |
Penalty | Z: Issued | 05/21/2018 | $6,467.00 | 06/08/2018 | Serious |
Text For Citation: 01 Item/Group: 008A Hazard:
29 CFR 1910.269(a)(2)(i)(A): Each employee was not trained in, and familiar with, the safety-related work practices, safety procedures, and other safety requirements in this section that pertain to his or her job assignments. Substation- Employees entering the substation and engaged in work activities including, but not limited to, thawing out pneumatic air lines controlling the closing of circuit breakers with open flames were not protected from electric shock and arc flash hazards where the employer did not train employees in regards to the minimum approach distances to exposed energized parts in the substation, required personal protective equipment to be worn, and the use of conductive tools and equipment within the substation.