Violation Detail
Standard Cited: 19260754 E05 I Structural steel assembly.
Inspection Nr: 1276626.015
Citation: 01008A
Citation Type: Serious
Abatement Date: 03/15/2018 2
Initial Penalty: $12,934.00
Current Penalty: $7,760.40
Issuance Date: 03/05/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0316400
Contest Date:
Final Order: 03/28/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/28/2018 | $7,760.40 | 03/15/2018 | Serious | |
Penalty | Z: Issued | 03/05/2018 | $12,934.00 | 03/15/2018 | Serious |
Text For Citation: 01 Item/Group: 008A Hazard:
29 CFR 1926.754(e)(5)(i): Metal decking was not laid tightly and immediately secured upon placement to prevent accidental movement or displacement. (a) VLR Tanks: On or about November 10, 2017, and times prior, two employees were permitted to walk and work on unsecured 19-SGI-4 aluminum I-bar grating, which were being installed to form one of the vertical loop reactor tank walkways.