Violation Detail
Standard Cited: 19100219 C02 I Mechanical power-transmission apparatus.
Inspection Nr: 1077467.015
Citation: 01008A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,930.00
Current Penalty: $6,930.00
Issuance Date: 12/24/2015
Nr Instances: 7
Nr Exposed: 30
Abatement Date: 06/01/2016
Gravity: 10
Report ID: 0729300
Contest Date:
Final Order: 01/21/2016
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/21/2016 | $6,930.00 | 06/01/2016 | Serious | |
Penalty | Z: Issued | 12/24/2015 | $6,930.00 | 02/12/2016 | Serious |
Text For Citation: 01 Item/Group: 008A Hazard:
29 CFR 1910.219(c)(2)(i): Exposed part(s) of horizontal shafting were not protected by stationary casing(s) enclosing shafting completely or by trough(s) enclosing sides and top or sides and bottom of shafting: a/ Inside of the Secondary Building, specifically the Two Roll Straightener, a horizontal shaft approximately four feet above the floor was not guarded. b/ Inside of the Main Building, specifically the Danieli Line, Two-Roll Section, a horizontal shaft approximately four feet above the floor was not guarded. c/ Inside of the Main Building, specifically the Schumag Line, two, horizontal shafts approximately four feet above the floor were not guarded. d/ Inside of the Main Building, specifically the Kieserling Line, two, horizontal shafts approximately four feet above the floor were not guarded. e/ Inside of the Main Building, specifically the Kieserling Line, at the Two-Roller Station, a horizontal shaft approximately four feet above the floor was not guarded.