Violation Detail
Standard Cited: 19100119 J05 Process safety management of highly hazardous chemicals.
Inspection Nr: 995848.015
Citation: 01008
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $4,000.00
Issuance Date: 03/13/2015
Nr Instances: 1
Nr Exposed: 75
Abatement Date: 04/17/2015
Gravity: 10
Report ID: 0213100
Contest Date:
Final Order: 03/31/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/31/2015 | $4,000.00 | 04/17/2015 | Serious | |
| Penalty | Z: Issued | 03/13/2015 | $7,000.00 | 04/17/2015 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits (defined by the process safety information on paragraph (d) of this section) in a safe and timely manner when necessary means were taken to assure safe operation: (a) Butane Bulk Storage Tank -- On or prior to September 18, 2014, external transfer piping and components were not painted or otherwise suitably protected from corrosion. (b) Butane Bulk Storage Tank -- On or prior to September 18, 2014, external fill pipe was supported by a temporary support (welding pipe stand). (c) Butane Bulk Storage Tank -- On or prior to September 18, 2014, SS butane liquid and vapor return lines connecting the bulk storage tank to the building were not protected from physical damage by vehicles at the southwest corner of the building.