Violation Detail
Standard Cited: 19100107 G03 Spray finishing using flammable and combustible materials.
Inspection Nr: 945904.015
Citation: 01008
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,800.00
Current Penalty: $1,680.00
Issuance Date: 05/01/2014
Nr Instances: 2
Nr Exposed: 3
Abatement Date: 06/18/2014
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 05/21/2014
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/21/2014 | $1,680.00 | 06/18/2014 | Serious | |
Penalty | Z: Issued | 05/01/2014 | $2,800.00 | 06/18/2014 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.107(g)(3): Residue scrapings and debris contaminated with residue were not immediately removed from the premises and properly disposed. Approved metal waste cans were not provided wherever rags or waste were impregnated with finishing material; and all such rags or waste were not deposited therein immediately after use. The contents of waste cans were not properly disposed of at least once daily or at the end of each shift. PAINTING AREA: On or about November 4, 2013, rags contaminated with acrylic urethane enamel, lacquer thinner, and epoxy primer which contain n-butyl acetate, 2-methoxy-1-methylethyl acetate, xylene, toluene, isopropyl alcohol and heptan-2-one were stored in an open metal pail.