Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 315174573
Citation: 01008
Citation Type: Serious
Abatement Status: X
Initial Penalty: $6,300.00
Current Penalty: $7,000.00
Issuance Date: 07/06/2011
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 08/22/2011
Gravity: 10
Report ID: 0214200
Contest Date: 07/07/2011
Final Order: 07/13/2012
Related Event Code (REC):
Emphasis:
| Failure to Abate | |||||||
|---|---|---|---|---|---|---|---|
| Activity Nr | Issuance | Penalty | Contest | Final Order | |||
| 300121340 | 03/30/2015 | 10/21/2015 | |||||
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| FTA | F: Formal Settlement | 10/21/2015 | 300121340 | |||
| FTA | Z: Issued | 03/30/2015 | 100373109 | |||
| FTA | Z: Issued | 10/21/2014 | $20,790.00 | 300121340 | ||
| Penalty | F: Formal Settlement | 07/13/2012 | $7,000.00 | 08/22/2011 | Serious | |
| Penalty | Z: Issued | 07/06/2011 | $6,300.00 | 08/22/2011 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard: CHEMNEP
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment: a) Building 71 and Fractionator Area The employer did not develop and implement written mechanical integrity procedures for all covered equipment used in the Polyphase Part II and distillation methanol recovery process. Violation occurred on or about 01/07/2011.n