Standard Cited: 19100147 D05 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 315144956
Citation: 01008
Citation Type: Serious
Abatement Status: X
Initial Penalty: $4,200.00
Current Penalty: $2,520.00
Issuance Date: 04/19/2012
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/31/2012
Gravity: 10
Report ID: 0111400
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/02/2012 | $2,520.00 | 08/31/2012 | Serious | |
| Penalty | Z: Issued | 04/19/2012 | $4,200.00 | 06/05/2012 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard: CHEMNEP
29 CFR 1910.147(d)(5)(ii): Where there was a possibility of re-accumulation of stored energy to a hazardous level, verification of isolation was not continued until the servicing or maintenance was completed, or until the possibility of such accumulation no longer existed: LOCATION: ICE MACHINES: The employer did not ensure that verification of liquid anhydrous ammonia isolation was continued where the possibility of re-accumulation of hazardous levels of ammonia vapors were possible, until after screen cleaning or other maintenace was completed.