Standard Cited: 19100119 D03 II Process safety management of highly hazardous chemicals.

Inspection Nr: 311917009

Citation: 01008

Citation Type: Serious

Abatement Status: X

Initial Penalty: $5,000.00

Current Penalty: $5,000.00

Issuance Date: 05/13/2009

Nr Instances: 6

Nr Exposed: 18

Abatement Date: 06/29/2009

Gravity: 10

Report ID: 0213400

Contest Date: 06/03/2009

Final Order: 12/24/2009

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty R: Review Commission 12/24/2009 $5,000.00 06/29/2009 Serious  
Penalty J: ALJ Decision 08/28/2009 $5,000.00 06/29/2009 Serious  
Penalty Z: Issued 05/13/2009 $5,000.00 06/29/2009 Serious  

Text For Citation: 01 Item/Group: 008 Hazard: REFINERY

29 CFR 1910.119(d)(3)(ii): The employer did not document that the equipment in the process complied with recognized and generally accepted good engineering practices (RAGAGEP): The employer could not document in their PSI that equipment in the process complied with RAGAGEP in the following cases: b- Hess Port Reading Refinery, Gas Con - The employer did not comply with RAGAGEP such as but not limited to ASME Boiler and Pressure Vessel Code, Division 1 (BPVC), Section VIII, UG-135(d) when it failed to provide adequate controls to ensure that the outlet block valve for RV-D-603-2 and a 6 inch block valve from E-641A C3/C4 Splitter Feed/Bottoms Exchanger to T- 621 C3/C4 Splitter were chain locked open. Conditions noted on or about 12/18/08 and 02/09/09, respectively. c- Hess Port Reading Refinery, FCCU - The employer did not comply RAGAGEP such as but not limited to ASME Boiler and Pressure Vessel Code, Division 1 (BPVC), Section VIII, UG-135(d) when it failed to provide adequate controls to ensure that the inlet block valve for RV-D-514-3 High Pressure Disengaging Drum was chain locked open. Condition noted on or about 12/16/08. d- Hess Port Reading Refinery, Alky - The employer did not comply RAGAGEP such as but not limited to ASME Boiler and Pressure Vessel Code, Division 1 (BPVC), Section VIII, UG-135(d) when it failed to provide adequate controls to ensure that the inlet valve and shell side block valve of E- 711B Feed/Effluent Exchanger were chain locked open. Condition noted on or about 02/27/09. f- Hess Port Reading Refinery, Dimersol - The employer did not comply with RAGAGEP such as but not limited to API 576 Section 4.9.2 when it failed to install a tell-tale indicator between the RD and pressure RV for S-2204B Caustic Rag Layer Filter. Condition noted on or about 03/05/09.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.