Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1759654.015
Citation: 01008
Citation Type: Serious
Abatement Status:
Initial Penalty: $6,913.00
Current Penalty: $6,913.00
Issuance Date: 01/02/2025
Nr Instances: 2
Nr Exposed: 4
Abatement Date: 02/03/2025
Gravity: 1
Report ID: 0627100
Contest Date: 01/24/2025
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 01/28/2025 | $6,913.00 | 02/03/2025 | Serious | |
Penalty | Z: Issued | 01/02/2025 | $6,913.00 | 02/03/2025 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going integrity of process equipment: a.) On or about July 3, 2024, at General Dynamics Ordnance and Tactical Systems (GD-OTS) facility in Hampton Arkansas, the employer failed to ensure that written procedures for inspecting 4-liter containers, which were used in the loader process, were established. b). On or about July 3, 2024, at General Dynamics Ordnance and Tactical Systems (GD-OTS) facility in Hampton Arkansas, the employer failed to ensure that written procedures for inspecting two conical funnels, which were used in the loader process, were established.