Violation Detail
Standard Cited: 19100269 L01 II Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1749405.015
Citation: 01008
Citation Type: Serious
Abatement Status:
Initial Penalty: $16,131.00
Current Penalty: $16,131.00
Issuance Date: 11/20/2024
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 12/03/2024
Gravity: 10
Report ID: 0213100
Contest Date: 12/19/2024
Final Order:
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 12/19/2024 | $16,131.00 | 12/03/2024 | Serious | |
Penalty | Z: Issued | 11/20/2024 | $16,131.00 | 12/03/2024 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.269(l)(1)(ii): Where employees work on or near exposed live parts, the employer did not ensure that only qualified employees worked in areas containing unguarded, uninsulated energized lines or parts of equipment operating at 50 volts or more: (a) Mount Ida Hydro Station, Control room level: On or about May 21, 2024, employees conducting maintenance on an Allis Chalmers MA-250C circuit breaker in a 4160-volt switchgear housing experienced an arc flash when the breaker contacted an energized cell during racking-in. The employer did not ensure that qualified employees performed servicing and maintenance on high voltage switchgear and associated equipment.