Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1691602.015
Citation: 01008
Citation Type: Other
Abatement Status:
Initial Penalty: $11,162.00
Current Penalty: $0.00
Issuance Date: 01/12/2024
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 09/16/2024
Gravity: 5
Report ID: 0523300
Contest Date: 02/21/2024
Final Order: 10/09/2024
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/09/2024 | $0.00 | 09/16/2024 | Other | |
Penalty | C: Contested | 02/22/2024 | $11,162.00 | 01/29/2024 | Serious | |
Penalty | Z: Issued | 01/12/2024 | $11,162.00 | 01/29/2024 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: On or about November 13, 2023, the employer did not conduct an annual or more frequent inspection of the energy control procedures to ensure that the procedure and the requirements of this standard were followed when employees performed servicing or maintenance on the Powder Horn Machine in the Production/Mix Area.