Violation Detail
Standard Cited: 19100303 G01 General.
Inspection Nr: 1687104.015
Citation: 01008
Citation Type: Serious
Abatement Status:
Initial Penalty: $2,678.00
Current Penalty: $1,607.00
Issuance Date: 01/10/2024
Nr Instances: 3
Nr Exposed: 10
Abatement Date: 10/25/2024
Gravity: 1
Report ID: 0524530
Contest Date: 05/10/2024
Final Order: 10/25/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/25/2024 | $1,607.00 | 10/25/2024 | Serious | |
Penalty | C: Contested | 05/10/2024 | $2,678.00 | 02/06/2024 | Serious | |
Penalty | Z: Issued | 01/10/2024 | $2,678.00 | 02/06/2024 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.303(g)(1): Sufficient access and working space was not provided and maintained about all electric equipment (operating at 600 volts, nominal, or less to ground) to permit ready and safe operation and maintenance of such equipment: On or about July 14, 2023, sufficient access and working space was not provided to the breaker panels in the utility room. Space in front of the panels was used for storage, and access space of two and one-half (2.5) feet deep by thirty (30) inches wide was not maintained in front of the panels.