Violation Detail
Standard Cited: 19100176 A Handling materials - general.
Inspection Nr: 1664911.015
Citation: 01008
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $11,162.00
Current Penalty: $6,838.00
Issuance Date: 09/06/2023
Nr Instances: 1
Nr Exposed: 31
Abatement Date: 05/20/2024
Gravity: 5
Report ID: 0626300
Contest Date: 09/20/2023
Final Order: 05/24/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/24/2024 | $6,838.00 | 05/20/2024 | Other | |
Penalty | C: Contested | 09/20/2023 | $11,162.00 | 09/18/2023 | Serious | |
Penalty | Z: Issued | 09/06/2023 | $11,162.00 | 09/18/2023 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.176(a): Where mechanical handling equipment is used, sufficient safe clearances shall be allowed for aisles, at loading docks, through doorways and wherever turns or passage must be made. Aisles and passageways shall be kept clear and in good repair, with no obstruction across or in aisles that could create a hazard. Permanent aisles and passageways shall be appropriately marked. a) On or about April 19, 2023, and at times prior thereto; in the Saw Shop, where employees operated powered industrial trucks and permanent aisles and passageways were not appropriately marked.