Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
Inspection Nr: 1616993.015
Citation: 01008
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $7,252.00
Current Penalty: $3,626.00
Issuance Date: 12/20/2022
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 5
Report ID: 0627100
Contest Date:
Final Order: 01/19/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/19/2023 | $3,626.00 | Serious | ||
| Penalty | Z: Issued | 12/20/2022 | $7,252.00 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: On or about September 21, 2022, in the production department by the Chicago, Dries & Krump brake press, the flexible cord was missing the ground pin from the male connector.
Translate