Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 1562842.015
Citation: 01008
Citation Type: Serious
Abatement Status: Quick Fix
Initial Penalty: $4,351.00
Current Penalty: $2,610.60
Issuance Date: 04/06/2022
Nr Instances: 1
Nr Exposed: 16
Abatement Date:
Gravity: 1
Report ID: 0636900
Contest Date:
Final Order: 04/06/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 04/06/2022 | $4,351.00 | Serious | ||
Penalty | I: Informal Settlement | 04/06/2022 | $2,610.60 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and cables were run through holes in walls, ceilings, or floors: On or about November 9, 2021, and at times prior thereto, between shipping and the oven areas, the employer did not ensure that flexible cords were running on the floor, exposing employees to trip hazards.