Violation Detail
Standard Cited: 19100303 G01 General.
Inspection Nr: 1480212.015
Citation: 01008
Citation Type: Other
Abatement Date: 3
Initial Penalty: $5,783.00
Current Penalty: $5,783.00
Issuance Date: 08/05/2020
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0729700
Contest Date:
Final Order: 08/26/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/26/2020 | $5,783.00 | Other | ||
Penalty | Z: Issued | 08/05/2020 | $5,783.00 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.303(g)(1): Sufficient access and working space was not provided and maintained about all electric equipment (operating at 600 volts, nominal, or less to ground) to permit ready and safe operation and maintenance of such equipment: In Plant Four the service disconnect switches were obstructed by equipment, exposing employees to struck by, electrical, and fire hazards.