Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1414616.015
Citation: 01008
Citation Type: Other
Abatement Date: 01/13/2020 2
Initial Penalty: $6,251.00
Current Penalty: $6,251.00
Issuance Date: 12/16/2019
Nr Instances: 1
Nr Exposed: 25
Related Event Code (REC): C
Gravity: 1
Report ID: 0728900
Contest Date: 01/14/2020
Final Order: 08/27/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/27/2021 | $6,251.00 | 01/13/2020 | Other | |
Penalty | C: Contested | 01/14/2020 | $6,251.00 | 01/13/2020 | Serious | |
Penalty | Z: Issued | 12/16/2019 | $6,251.00 | 01/13/2020 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: The employer is failing to protect employees from electric shock hazards by using temporary wiring, flexible extension cord, as a substitute for fixed wiring. The most recent occurrence was evident during the inspection conducted on July 10, 2019 at 1200 Centennial Rd., Wayne, NE 68787. The employer is using a flexible extension cord in place of fixed wiring to provide power to a band saw. This configuration has been in place for approximately 6 months.