Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1225855.015
Citation: 01008
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,157.00
Current Penalty: $8,944.80
Issuance Date: 09/11/2017
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 02/25/2019
Gravity: 5
Report ID: 0524500
Contest Date: 09/20/2017
Final Order: 01/28/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/28/2019 | $8,944.80 | 02/25/2019 | Serious | |
Penalty | C: Contested | 10/27/2017 | $6,157.00 | 09/26/2017 | Serious | |
Penalty | Z: Issued | 09/11/2017 | $6,157.00 | 09/26/2017 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: On or about April 20th, employees were exposed to electric shock hazards due to improper electrical installations in the following areas: a. At Garment Mend, the Thermoset machine was plugged into a relocatable power tap which was powered by a portable metal outlet box connected with flexible cord; b. At the Shirt-Pant Press Area, there was a metal outlet box intended for wall mounting attached to an extension cord and used to supply 110-volt service to a floor fan.